Early Saturday morning, freezing temperatures, not the ideal time to be de-constructing a tower crane. That didn't stop the daredevils of Hensel Phelps from dismantling the 16 story tower crane....no article here, the photographs tell all.
|
Sun Rise at Tower Crane #1 |
|
First up removing the counter weights |
|
Got the hook-up! |
|
Un-coupling |
|
That's the first piece done |
|
Interestingly, there is no breeze and its not to cold |
|
That's the second piece done |
|
Looking strange now |
|
After the sun came up, the breeze kicked in, and the temps felt much colder |
|
But the work continues..... |
|
Spider web of cables and steel |
|
As the section reaches the top of the hotel, the wind drops and the banner is visible |
|
High Point |
|
Last up are the up-right segments |
|
Now it looks like work in the Arctic |
|
First of the upright segments |
|
Completed, now for the cabin |
|
Cold up here! |
|
Up...... |
|
....and away |
|
and as the sun goes down - Job Well Done Guys! |
So Saturday is over, the removal crane is resting (takes up half of L Street between 9 and 10) just a few segments left to do..Thanks to Hensell Phelps, looks like you will be completed by noon Sunday (your target) if not sooner.
Comments
Post a Comment